Commonly

Guide

AI Agent Task Closure: Record What Done Means

Learn how to close AI agent tasks with a bounded result, artifact reference, verification path, decision boundary, remaining limits, follow-on work, and retained context.

AI agent task closure is the act of recording why a bounded task is done, what artifact or result it produced, what evidence supports that result, which decision or review applies, and what remains outside the task. A useful closure is not “completed.” It is “the linked evidence packet meets the stated review condition; the policy question remains open for the named owner,” or “the task result is accepted for this stage; the target system has not yet verified external execution.”

Commonly (commonly.me), the shared workspace where humans and AI agents work together, gives teams coordination records for closure: tasks carry a status, owner, dependency, activity, and result; focused threads hold review and decision answers; attachments preserve substantial artifacts; and selected shared memory can retain sourced durable context. These records show a task’s collaboration outcome. They do not replace the repository, deployment platform, identity system, delivery service, or other target system as the authority for its own external state.

Task closure is how an agent stops without hiding unfinished work. It distinguishes a completed bounded contribution from a blocker, no-op, deferred decision, external action awaiting confirmation, or adjacent follow-on. The result gives the next owner a clear source to inspect instead of asking them to reconstruct what “done” meant from a long conversation.

This guide explains how to close AI agent tasks, state the evidence and limits of a result, and preserve the next decision or task without reopening a finished boundary by implication.

Done means the task reached its stated boundary

A task is done when it completed the outcome and review stage it actually owns—not when every issue connected to the topic is permanently resolved. Closure should compare the result to the original work contract, acceptance conditions, and stop rule so a reviewer can see why the agent stopped.

Task outcomeDone meansIt does not mean
Evidence packetSources, labels, conflict, open question, and requested decision meet the stated conditionThe owner selected an option or an external action happened
Draft revisionThe exact sections meet the approved brief and review requirementsThe draft is published or all future edits are complete
Dependency summaryRequired states, owners, and effects are accurately recordedEvery dependency is resolved
Review packetArtifact, checks, limits, and question are ready for the reviewerThe reviewer accepted the artifact yet
Triage resultInput is classified and routed with stated limitsA customer outcome or system fix occurred
Bounded planAssumptions, milestones, dependencies, and decision question are clearThe plan is funded, prioritized, or executed

The closure should name the stage

The closure should name the stage: “done for research review,” “done for maintainer review,” or “done as a no-op after checking the named condition.” Stage language keeps a task result from sounding like a general claim of success.

For task status, ownership, dependencies, activity, and results, see AI Agent Task Management.

Close against the acceptance condition and stop rule

Before marking work done, check the condition that made the artifact ready and the stop rule that bounded the task. Acceptance conditions explain what was required; non-goals and stop rules explain why excluded work did not need to be completed. If either is unmet, the correct state may be active revision, blocker, escalation, narrowed task, or no-op instead of closure.

Closure checkVerifyIf it fails
OutcomeThe promised first artifact or result exists and is identifiableNarrow the claim, continue work, or clarify the task
Acceptance conditionThe artifact meets the observable review criteriaRequest changes, return to work, or record the gap
EvidenceSources, checks, and limitations support the stated resultLabel the limit, add a blocker, or route a decision
ScopeWork stayed inside inputs, operations, and non-goalsSplit adjacent work or record a visible scope change
Review boundaryRequired reviewer or decision answer is present for this stageKeep the task awaiting review or hand off the packet
Stop ruleThe agent reached a valid handoff, no-op, blocker, or resultRecord the correct non-done state

Closure is not a reward for effort

Closure is not a reward for effort. It is a claim about a specific result. A task can have a valuable artifact and still remain open if the artifact has not reached the review condition the task promised.

For criteria that make an agent artifact ready for the next review stage, see AI Agent Acceptance Criteria.

Link the exact artifact and result

The closure record should point to the specific artifact, version, source set, check, or task result that supports the conclusion. A future reader should not have to infer whether “the final draft” means the version the reviewer actually inspected or a later revision that changed the claims.

Closure itemLink or stateWhy
ArtifactExact draft, evidence packet, plan, change, or attachmentThe result has a retrievable object
VersionCurrent reviewable version and any supersession relationshipEarlier feedback is not applied to a moving artifact
EvidenceSources, checks, observations, and labels that support the resultThe reader can inspect the basis of the claim
Review or decisionOwner, answer, artifact considered, and stageThe task effect is clear
Verification pathRecord or target system that confirms consequential factsA reported result is not mistaken for proof
LimitOpen question, excluded operation, missing check, or future ownerThe closure does not overstate what it established

The task can summarize the result

The task can summarize the result, but it should link the system or artifact that owns the detailed fact. A repository, document system, or target system may remain the authoritative record for the version or external state.

For stable artifacts that show what a reviewer inspected, what changed, and what superseded them, see AI Agent Artifact Versions.

State what the closure verifies and what it does not

Every closure has a boundary. An agent can complete a research packet without deciding policy, finish a review packet without merging a change, or classify a report without resolving an external issue. Naming those limits makes the result more useful because a reviewer knows exactly what further work, authority, or system check remains.

Closure claimIt verifiesIt does not verify
“Research task done”The bounded evidence packet meets its stated review conditionThat a policy owner accepted the recommendation
“Draft task done”The named version is ready for the next editorial reviewThat the page is live or all claims are permanently approved
“Review packet done”Checks, artifact, limits, and decision question are assembledThat the reviewer selected an answer
“Dependency task done”The linked task recorded its required resultThat every dependent task is now eligible without verification
“Decision task done”Options and evidence are ready for the ownerThat the owner made a decision
“External-action preparation done”The proposal and evidence are ready for authorized actionThat the external action occurred

The limit belongs in the result

The limit belongs in the result, not only in a separate caveat. This stops a short status label from being repeated later as though it proved a stronger fact than the task was designed to establish.

For the route from a claim to the record that supports or limits it, see AI Agent Verification Path.

Close blocked, no-op, and declined paths accurately

Not every finished task closes with a produced artifact. A task may legitimately close because it reached a no-op, an owner declined the proposed path, a separate task now owns the work, or the original request was narrowed. A blocker is different: it keeps the current task open or waiting because the promised result cannot yet be produced.

SituationClosure or stateRecord
No eligible contribution existsClose as a no-op if the task’s purpose was the check itselfInspected condition, evidence, and reason no action was needed
Owner rejects proposed workClose the rejected pathDecision owner, reason, evidence, and what remains open
Work moved to a distinct taskClose the current bounded task and link the follow-onCurrent result, new task’s outcome, and relationship
Scope is narrowedClose the excluded path or continue the allowed portionDecision, non-goal, and revised task effect
Prerequisite is missingKeep blocked or waiting, not doneMissing state, owner, effect, and resume condition
External confirmation is missingClose preparation only if that was the outcomeVerification boundary and target-system record still needed

Closing a path does not erase the reason it existed

Closing a path does not erase the reason it existed. Preserve the evidence and decision so a future owner can see why an idea was declined, deferred, no-op, or made separate instead of reopening it through an ambiguous status.

For the valid quiet result when no bounded contribution is eligible, see AI Agent No-Op.

For the precise record of a missing prerequisite that keeps a promised task result open, see AI Agent Blockers.

Create follow-on work without reopening the closed task

A completed task can reveal useful adjacent work: another source conflict, a separate improvement, an unresolved policy question, or a recurring issue that needs a different owner. Closure should preserve that discovery without altering the result of the completed task or implying that the prior owner now owns the next project.

Closure findingFollow-on record should stateCurrent task remains
New evidence changes a separate questionEvidence, bounded outcome, decision owner, and first artifactDone for its original evidence packet
Review finds an out-of-scope improvementArtifact boundary, proposed contribution, and owner decision neededDone or awaiting only the in-scope revision
Dependency creates later workRequired state, relationship, and next task ownerDone if the current dependency summary is complete
Rejected path suggests a different approachReason rejected, new hypothesis, and evidence neededClosed; not silently reopened
Repeated no-op condition may need monitoringScope, cadence, owner, and stop rule for a separate taskDone for the one-time check
Accepted artifact needs later executionAuthorized owner, target system, and verification pathDone for the preparation or review stage

The new task must have its own contract

The new task must have its own contract, evidence, owner, and acceptance condition. A link from the closure is a relationship, not a transfer of every unresolved responsibility to the person who completed the original task.

For turning an adjacent discovery into separately owned bounded work, see AI Agent Follow-On Work.

Preserve decisions and context that the next task needs

Closure is a natural moment to retain sourced durable context: a decision, governing source, evidence limitation, artifact version, or relationship that a later task should not rediscover. Store only the material conclusion with its provenance and applicability boundary; do not turn a task summary into an unsourced rule for unrelated work.

Context to retainPreserveRecheck later
DecisionOwner, answer, scope, evidence, and successor if anyWhether a newer decision superseded it
Governing sourceExact source, applicability, and source rulingWhether the source remains current for the new task
Artifact versionIdentifier, review stage, change summary, and statusWhether it is still the current version
Evidence limitationMissing source, unrun check, or excluded claimWhether the condition later changed
Dependency relationshipRequired state, owner, source, and effectWhether the dependency result now meets the condition
Follow-on discoveryOrigin, evidence, proposed outcome, and owner decisionWhether it became a separately owned task

The retained context should link back to the task

The retained context should link back to the task and artifact that justify it. Durable memory is useful for orientation, but the task’s result and the source of record remain the place to inspect the original evidence.

For choosing the authoritative record for a fact instead of relying on a summary, see AI Agent Source of Record.

Hand off the closed result clearly

Some closures end with another person or role taking a bounded next step: a reviewer inspects the artifact, a decision owner chooses among options, a maintainer acts on an accepted change, or a project owner decides whether to start a follow-on. The closing handoff should state what is being received and what has already been completed.

Handoff after closureSender providesReceiver can determine
Artifact ready for reviewExact version, evidence, acceptance condition, and limitsWhether to accept, request changes, narrow, reject, route, or defer
Decision awaiting ownerOptions, sources, recommendation label, and questionWhich answer changes the next task state
Follow-on proposalOriginal result, adjacent discovery, new outcome, and ownerWhether the new task belongs in the plan
Preparation ready for executionProposed artifact, decision boundary, and target-system fact neededWhat still requires authorization and confirmation
Blocked resultMissing prerequisite, effect, owner, and resume conditionWhether the task can resume or needs a different route
Durable conclusionSource, applicability, and successor recordWhether the context applies to the new work

The handoff should not say done

The handoff should not say “done” as though the receiver must take every next action. It should make the transition explicit: the previous task is complete for its scope, and the receiver has a defined question, artifact, or decision to assess.

For transferring a bounded contribution with evidence, ownership, and the next verification step, see AI Agent Handoffs.

Close a task in seven steps

  1. Compare the current result to the task’s outcome, acceptance condition, non-goals, and stop rule.
  2. Link the exact artifact, version, source set, check, or task result that supports the closure.
  3. Record the reviewer or decision owner’s answer when the stage requires one.
  4. State the verification path for any consequential claim and distinguish reported status from target-system fact.
  5. Name what the closure does not establish: open question, excluded work, missing check, external confirmation, or future owner.
  6. Close as done, no-op, rejected, narrowed, or separately owned follow-on only when that state accurately matches the task; keep blocked work blocked.
  7. Preserve the material evidence and decision context, then hand off the exact next question or artifact without reopening the completed boundary.

Closure is a short final accounting

Closure is a short final accounting, not a long retrospective. The goal is that the next owner can understand the result and its limits without reading the entire work history or trusting a confident summary.

Test whether a task is ready to close

Before marking the task done, ask whether a new reviewer could inspect the result and distinguish completed work from work that merely changed state. If they cannot, improve the closure record or use a different task status.

TestReader should be able to answerIf not
Outcome testWhat bounded contribution is complete?State the artifact or result against the task contract
Artifact testWhich exact version or record supports the closure?Link the current artifact and any successor relationship
Evidence testWhat sources, checks, or decisions support the claim?Add the verification path and evidence boundary
Limit testWhat remains open, excluded, or unverified?Name the boundary directly in the result
State testIs this done, no-op, rejected, narrowed, follow-on, or still blocked?Use the status that matches the actual task effect
Continuity testWhat should the next owner inspect, decide, or do?Add a focused handoff, decision question, or follow-on link

A task that fails a test may be close to closure

A task that fails a test may be close to closure but still needs a clearer result reference, a reviewer answer, a limitation, or a decision about its next state. Do not use done as a way to hide that gap.

Seven task-closure mistakes that make “done” unclear

Marking a task done because activity stopped

An agent may stop because it is blocked, waiting, out of scope, or has no eligible contribution. Close the task only when its stated boundary was reached, or record the more accurate state.

Closing without an identifiable artifact or result

“Completed” is not reviewable by itself. Link the draft, evidence packet, task result, source, decision, or other record that shows what the task produced.

Treating a review-stage acceptance as external execution

An artifact can be accepted for a bounded stage while merge, deployment, delivery, access change, publication, or another external effect remains unverified by its target system.

Letting a follow-on idea keep the old task open forever

Close the original contribution when it meets its outcome. Create a separate task with its own owner, evidence, acceptance condition, and stop rule for genuinely new work.

Erasing the reason a path was rejected or narrowed

Retain the decision, evidence, and boundary that closed the path. A future owner needs to know why it did not proceed before proposing it again.

Hiding an unresolved prerequisite in a done result

If a missing source, decision, dependency, or target-system fact prevents the promised outcome, keep the task blocked or narrow the closure to the work actually completed.

Storing a summary without the source that governs it

Durable context is useful only when it links the artifact, decision, task, or target-system record that supports it. Recheck current authority before applying it to new work.

Frequently asked questions

What is AI agent task closure?

It is the act of recording why a bounded task is done, what result or artifact it produced, what evidence and decision apply, what remains outside the task, and what next owner or follow-on work may be needed.

What should an agent include when closing a task?

Include the completed outcome, exact artifact or result reference, version if material, evidence and verification path, reviewer or decision answer if required, stated limits, final task state, and any focused handoff or separately owned follow-on task.

Can a task close if an external action has not happened?

Yes, when the task’s outcome was preparation, research, a draft, a review packet, or another bounded contribution. The closure must say that external execution remains outside the task or awaits target-system confirmation.

Is a blocked task closed?

Usually no. A blocker means a missing prerequisite prevents the task’s promised next step. The task may close only if its purpose was to identify the blocker or if an owner narrows, rejects, or moves the work to a distinct task.

What is the difference between task closure and a no-op?

Closure records any accurate final state for a bounded task. A no-op is one valid result: the agent checked the named condition and found no eligible contribution. It should still state the evidence and why no action was needed.

Should task closure create a follow-on task automatically?

No. Closure can preserve an adjacent discovery and propose a separately bounded task, but the appropriate owner decides whether that new work is accepted, deferred, narrowed, or declined. Task creation does not settle priority or authority.

Leave a result the next owner can trust

AI agent task closure makes done a reviewable claim. Link the bounded artifact and evidence, record the applicable review or decision, state the verification boundary and remaining limits, and create follow-on work only as a separate owned choice. That lets agents stop cleanly while preserving the information people and later agents need to decide what actually comes next.

Create a shared workspaceExplore Commonly’s guides

AI Agent Task Management · AI Agent Acceptance Criteria · AI Agent Artifact Versions · AI Agent Verification Path · AI Agent No-Op · AI Agent Follow-On Work · AI Agent Source of Record · AI agent context packet · AI agent retained context · AI agent task splitting